收到以下装修报价, 及付款方式,想问问各位大神的意见 一个厕所门换个地方, 换两个新的厕所门 , 油漆4 房 (HDB), living room 两个实心线去掉 PROFESSIONAL SERVICES 1 Design consultation and space planning 2 Proposed of colour materials and accessories 3 Project management and site supervision 4 Provide detailed work schedule 5 Consultation on furnishing 6 60 months warranty with guaranteed after sales service on workmanship HACKING $1,500.00 7 Provide labour & tools to hack 4ft existing toilet wall 8 Provide labour & tools to hack living room wall beading 9 Provide labour & tools to hack common toilet sanitary ware 10 Provide labour & tools to hack 2 unit toilet door 11 Provide labour & tools to hack kitchen kerb MASONARY 12 Provide labour & materials to construct 3.5ft wall at kitchen area $2,600.00 13 Provide labour & materials to make good wall post hacking 14 Provide labour & materials to lay wall tiles over kitchen wall post hacking 15 Provide labour & materials to lay wall tiles over toilet wall post hacking 16 Provide labour & materials to make good living room wall PLUMBING (INCLUDES PIPING FOR COLD POINT ONLY) Master bathroom 17 Provide labour to install 1 set WC $120.00 DOOR Master bathroom / Common bathroom 24 Provide and install 1 set of swing & slide door $400.00 Provide and install 1 set of swing & slide door w/Louvre on top $600.00 PAINTING 25 Provide labour with NIPPON VINILEX 5000 to paint whole unit internal walls & ceiling $1,300.00 26 Painting of all pipes, door frames & gate with NIPPON gloss paint 27 Provide labour to shift furniture MISCELLANEOUS 28 Application and processing of HDB permit $350.00 29 Provide labour to do debris clearing & haulage upon completion of works $650.00 30 Provide labour to do general washing upon completion of works $250.00 31 Final defects checking to customer's satisfaction 32 Certificate issued GRAND-TOTAL : $7,770.00 Optional Provide labour to install 1 set instant heater $80.00 GRAND-TOTAL : $7,850.00 a) NOTE: This quote and its STATED/GIVEN PROMOTIONS is only valid for 14 days from date issue as above. b) All Customer's particulars obtained are solely for the purposes of completing services. We will seek consent from Customers should their particulars be used for purposes other than internal marketing and billing purposes. Payment Schedule and Information: c) All payment made to xxxx should be in the form of cheque (crossed), bank transfer d) The Payment Schedule as follows: Payment Term: Amount: 10% - Upon Confirmation of the Quotation 50% - Before Commencement of Works (i.e. after confirmation of 3D drawing/application of renovation permit/ approval by managemet) 35% - Upon Measurement and Confirmation of second PD door in common toilet 5% - Upon Completion and Handover to Home Owner e) All minor works are not to follow the original payment schedule. Minor works are works that consists of not more than 2 scope of works as listed in the original renovation scope of works. (e.g. only carpentry and painting) f) All minor works payment will be made up to 95% of the payment BEFORE commencement of works. The remaining 5% will be held till delivery and satisfactory handover to owner. |