|
laaal LV9
发表于 15-7-2007 15:26:00
|
显示全部楼层
<p>一月的一个报价</p><p>NO Description Amount:<br/>Promotional Package for kitchen and 2 nos of toilets - items 1 to 31 $11,888.00 <br/>Hacking Works <br/>1 Hack existing kitchen wall and floor tiles <br/>2 Hack/dismantle existing kitchen cabinet <br/>3 Hack 2 nos of toilet wall and floor tiles <br/>4 Dismantle/remove toilet WC , basin and fittings <br/>Masonary Works <br/>5 Supply and lay cement screeding for kitchen and 2 nos of toilet wall <br/>6 Supply and lay ceramic wall tiles for kitchen and 2 nos of toilet ( Promotion Package <br/>Material for wall tiles $2 ) <br/>7 Supply and lay cement screeding for kitchen and 2 nos of toilet floor <br/>8 Supply and lay HDB approved water proofing membrane-K11 for kitchen floor <br/>and 2 nos of toilet <br/>9 Supply and lay heavy duty homogeneous floor tiles for kitchen and 2 nos of <br/>toilet floor tiles and kitchen screeding only ( Promotion Package Material for floor <br/>tiles $ 2.5 ) <br/>10 Supply and construct 1 nos of concrete cabinet base c/w side tiling works <br/>11 Supply and construct concrete fridge and washing machine <br/>base with full tiling work <br/>Plumbing Works <br/>12 Supply and install new copper piping for whole house <br/>13 Supply and install outlet piping for sink and washing machine <br/>14 Supply and install 1 nos of kitchen sink and sink tap <br/>15 Supply and install 2 nos of dual flush system toilet bowl <br/>Model:Saniton/HCG, Colour <br/>16 Supply and install 2 nos of basin and 2 no.s basin tap <br/>17 Supply labour to install 2 nos of bathroom accessories c/w mirror <br/>Electrical Works <br/>18 Supply labour to install back new 4 X lighting point,2 X double socket outlet, <br/>2 X single socket outlet,1 X cooker hood point.1 X cooker hob point and <br/>2 X heater point <br/>Aluminium Works <br/>19 Supply and install 2 nos of WPC aluminium frame c/w 2/4 acrylic panel toilet <br/>bifold door <br/>Carpentry Works <br/>20 To design and fabricate L20ft laminates solid ply kitchen cabinet c/w laminated <br/>casement door with ABS trimming,stainless steel handles,2nos.of frosted <br/>glass and 1nos.of 2 tier stainless steel diskrack with drip tray <br/>21 Supply and install L10ft solid surface work top at kitchen <br/>Miscellaneous <br/>22 Haulage fee:uploading of cement, sand, tiles and material and downloading of <br/>debris <br/>23 Provision of waste container lorry and disposal of debris to M.O.E approved <br/>dumping ground <br/>24 Supply of corrugated paper and plaster sheet for flooring protection <br/>25 Chemical wash upon completion of works <br/>26 HDB permit handling fee <br/><br/><br/>FOC Item <br/>27 Supply and install 2 nos of toilet accessories c/w mirror FOC <br/>28 Supply and install 2 nos of instant heater FOC <br/>29 Supply and install 2 nos of 2 way tap FOC <br/>30 Supply and install 1 nos of washing machine tap FOC <br/>31 Supply and install 1set of Hood and Hob FOC <br/>Hacking Works <br/>32 Hack existing floor tiles at living,dining hall,store room balcony and 3 nos of bedroom $800.00 <br/>33 Hack existing wall tiles at balcony $200.00 <br/>34 Hack/dismantle existing alum sliding door at balcony $80.00 <br/>35 Hack/dismantle simple cornices at whole house $200.00 <br/>Masonary Works <br/>36 Supply and lay 600mm X 600mm homogenous floor tiles at living/dining hall,stroe room $4,200.00 <br/>and 3 nos of bedroom c/w skirting ( Material for floor tiles $2.8 ) <br/>37 Supply and lay heavy duty homogenous floor tiles at balcony $500.00 <br/>38 Supply labour to make good at balcony wall after hacking $250.00 <br/>39 Supply labour to make good at wall after dismantle sliding door at balcony $80.00 <br/>40 Supply and install stainless steel flat rubbish chute at kitchen $180.00 <br/>41 Supply and construct shower kerb at master toilet $80.00 <br/>Carpentry Works <br/>42 Supply and install additional L12ft for kitchen cabinet $960.00 <br/>43 Supply and install additional L8.5ft solid surface work top at kitchen $595.00 <br/>44 To design and fabricate L10ft laminated sliding door wardrobe at master room $1,850.00 <br/>45 To design and fabricate L5ft laminates full height shoe rack at main entrance $900.00 <br/>46 To design and fabricate L4ft laminates full height divider at main entrance $600.00 <br/>Aluminium Works <br/>47 Supply and install B.A or Sliver alum grill for whole house ( 218sgft ) $980.00 <br/>48 Supply and install B.A or sliver alum frames c/w tinted glass sliding window at balcony, $1,080.00 <br/>dining hall and kitchen ( 108sqft ) <br/>Temper Glass Works <br/>49 Supply and install 10mm L-shape frameless shower screen at master toilet $450.00 <br/>Vanity Top Works <br/>50 Supply and install L3ft solid surface vanity c/w top and bottom cabinet storage and $1,050.00 <br/>mirror in laminates finish at master toilet <br/>Cornices Works <br/>51 Supply and install false ceiling at main entrance and passage way $180.00 <br/>52 Supply and install L-Box light holder at living hall $330.00 <br/>53 Supply and install L-Box light holder at dining hall $250.00 <br/>54 Supply and install plaster board to box up bedroom door above louvres $50.00 <br/>Paint Works <br/>55 Paint for whole unit all door,frames and all pipes(ICI or NIPPON emulsion paint) $1,000.00 <br/>56 Plastering for whole unit wall and ceiling $1,650.00 <br/>Electrical Works <br/>57 D.B Box $250.00 <br/>58 22 nos of Lighting Point $416.00 <br/>59 22 nos of Fitting Light $160.00 <br/>60 5 nos of Single point $225.00 <br/>61 5 nos of Double Point $275.00 <br/>62 1 nos of Air-Com Point $90.00 <br/>63 4 nos of SCV TV Point $360.00 <br/>64 3 nos of Tel Point $150.00 <br/>65 1 nos of Fan Fitting $45.00 <br/>Total: $32,354.00 </p> |
|